I have 580 vdc on node B in the power supply of this svt I'm working on.
Node A is 685vdc and R49 reads fine on my meter. R47 and R48 also check ok.
Node C is within spec as well.
Do wirewound like R49 change value before they fail?
I should add nodes D and E are within spec as well.
Node A is 685vdc and R49 reads fine on my meter. R47 and R48 also check ok.
Node C is within spec as well.
Do wirewound like R49 change value before they fail?
I should add nodes D and E are within spec as well.
Comment