My 5e3 kit will probably be arriving in the next week or so.
I read a few posts where people have received bad parts and or manufacturing defects with some kits and waste time troubleshooting after the kit was built to find the problem.
I am a believer in doing some prep checking upfront to to try to minimize problems on the back end.
Aside from taking an inventory of the parts and comparing to the schematic and bill of materials... what else should I check before starting to assemble?
I read an article about doing some checks of the transformer before the wires are soldered.
Any advice on this topic or pointers to articles that describe a build "preflight" would be much appreciated.
I read a few posts where people have received bad parts and or manufacturing defects with some kits and waste time troubleshooting after the kit was built to find the problem.
I am a believer in doing some prep checking upfront to to try to minimize problems on the back end.
Aside from taking an inventory of the parts and comparing to the schematic and bill of materials... what else should I check before starting to assemble?
I read an article about doing some checks of the transformer before the wires are soldered.
Any advice on this topic or pointers to articles that describe a build "preflight" would be much appreciated.
Comment